Engineering Problems We PreventTypical causes of unstable operation of pumps, drives and heating units that we eliminate at the equipment selection stage:
Due to mismatch of power, heating modes and temperature control systems.
Due to incorrect selection based on flow rate, suction conditions and operating medium.
Load, torque and gear ratio do not match real operating conditions.
Filtration degree and filter design do not match contamination type and operating mode.
Heated hose for co-extruder (sanctioned component)
Task: Ensure co-extruder heating and replace a sanctioned component without stopping the production line.
Initial parameters: Co-extruder temperature regime, connection type, compatibility requirements.
Problem: Original part unavailable due to sanctions; alternative suppliers offered high prices and long lead times.
What we did: Selected a technically compatible heating hose, fixed the cost, approved the solution with the customer’s technologist and organized delivery with installation.
Result: Part found in 2 days, cost 4 times lower than competitors. Delivery and installation completed within 2 weeks, downtime prevented.
Case 2.
Spare parts for extrusion machine
Task: Ensure delivery of spare parts for an extrusion machine under limited timeframes and high supplier prices.
Initial parameters: Extrusion equipment model, spare part specifications, compatibility and service life requirements.
Problem: Long delivery times and high costs from alternative suppliers; lack of confidence in result.
What we did: Analyzed compatible alternatives, agreed on trial delivery, ensured compliance control.
Result: First batch delivered in 3 weeks. Parts confirmed performance, customer continued long-term cooperation.
Case 3.
Electrical kit for injection molding machines
Task: Select and supply an electrical kit for injection molding machines with strict commissioning deadlines. Initial parameters: Machine configuration, electrical component requirements, approved delivery terms.
Problem: Risk of launch delays using standard logistics schemes.
What we did: Quickly selected components, agreed supply composition and optimized logistics.
Result: Components selected within 2 hours, delivery completed 2.5 weeks earlier than planned, without additional cost.
About INTERPLAST
For 10 years, we have been supplying equipment and services for the polymer industry. Since 2024, we have been developing the ZENTRA brand to supply spare parts across various industries — from polymer to food and mechanical engineering sectors.
Brands We Work With
We select solutions with consideration of service life and operating cost
Send a photo, name or part number — our specialist will select the required component and contact you to propose suitable options
Select parts
Send a photo or part number — we’ll find the required spare part within 2 hours
Select parts
Send a photo or part number — we’ll find the required spare part within 2 hours
This site uses cookies. The information collected using cookies cannot identify you, but it can help us improve the performance of our site. You can opt out of using cookies by selecting the appropriate settings in your browser. By using this site, you agree to the processing of your data. Personal data processing policy